Welcome to Roemheld UK
Deutsch
Français
Español
Italiano


LATEST NEWS
Home page
Events and exhibitions
Fixture/design builder
Case Histories
RIC-CD-ROM
Brochures
Certification
Distributors
Contact us
Site map
spacer spacer
Roemheld downloadable Power Point presentations
Click here to register for our Driving Success Through Innovation Seminars 2007
Gripping News e-newsletter
spacer Subscribe below
spacer
Email:

Name:


spacer


ROEMHELD UK LTD
Registered address:
Roemheld UK Ltd
Rubery House
The Avenue
Rubery
Birmingham
B45 9AL.
T: +44 (0)121 453 1414
F: +44 (0)121 460 1798

VAT no: GB426 6594 27
Company reg no: 1941520
Place of reg: Bedford


spacer
 
 
     
  << Back  
     
  ROEMHELD VICE SYSTEMS MAKE LIGHT WORK OF POWER MILLING AT WOOLLEY-GMC  
 
ROEMHELD VICE SYSTEMS MAKE LIGHT WORK OF POWER MILLING AT WOOLLEY-GMC
DS 125 Hilma Vices complete with Special oversize designed jaws
Providing production and prototype engineering services to OEM companies across the off-road and power generation sectors is heavy work which quickly takes its toll on machining centres. That is why Woolley-GMC specifies Roemheld Hilma DS125 double clamping vice systems for all its steel casting work as they know the vices can take the strain of power milling.

Chris Ward, Senior Process Engineer at Woolley-GMC, said: “Some of our Roemheld vices are now four years old and have never needed replacement or repair. In fact the machines wear out before the Roemheld vices do. We tried other standard vices but the jaws just couldn’t hold the weight of the component and withstand the cutting forces being applied.”

Woolley-GMC specialise in producing engine backplates and manifolds along with components for fuel injection systems and pulley systems. The company designs and makes its own fixtures in-house as all of its production is non-standard, pushing fixtures and vices to the limit. They design and machine their own outsize jaws for use with the Roemheld vice systems.

Because of the demands of this hostile engineering environment, reinvestment in plant is a key part of the company’s success and as part of its replacement programme, 12 machines will be replaced within the next 4 years. In addition, the company is just about to take delivery of three new machines: a 500mm pallet horizontal, a 1m bed vertical and a Twin spindle lathe.


As part of this capital investment, a further 19 Roemheld Hilma DS125 double clamping vices are being installed. This will be supplied via AC Hydraulics, the Roemheld distributor for the area, who have been supplying product to Woolley-GMC for over 8 years.

Part of Woolley-GMC’s success is that it has developed a niche role, supplying volumes that are not big enough for automotive contractors but that are too big for the smaller ‘jobbing’ shops. With medium to low volume production and repeat orders, Woolley-GMC produce a wide range of steel components from 1.5m x 1.2m engine back plates through to phosphor bronze pins. Repeatability and tolerances are key, which is why the company sticks with tried and tested fixture components specifying manual clamps, magnets or Roemheld vices, dependent upon the fixture design and purpose.

Weekly production volumes vary to meet the delivery requirements of customers, with scheduling taking place up to 6 months in advance. As a result, shift patterns and working activities of its 80 plus staff have to be flexible, with multi-tasking and weekend working utilised as required.

To keep ahead of the demands of the industry and broaden its manufacturing potential, Woolley-GMC is currently working for full environmental certification and the TS60949 certificate.

Chris Ward said: “ We operate a quality culture throughout the organisation, subcontractors and our 2nd Tier Supplier Base, based on our total commitment to customer satisfaction and our "Zero" defects philosophy. By using Roemheld for all our double clamping vice systems, we know that they will support this commitment and deliver the quality we need as standard.”

This desire to keep ahead of the market is also reflected in Woolley-GMC’s ambitious plans for the future. A new unit is currently being built at Woolley-GMC’s manufacturing base in Coventry, to create additional manufacturing

capacity as the company continues to generate more and more orders: primarily from the UK, but also from gains within Europe and the USA. The company is predicting an increase in turnover from £10 million to £15 million over the next five years.
 
     
 
 
 
 
 
 

 

 

 